Its a beautiful summer afternoon. We’ve just driven through a torrential downpour and arrived at Harper Creek. You can still detect that fresh earthy smell after a storm. We’ve come down to pay a visit to two of the most recent development projects in the watershed. As we pull off the road we can already see the significant changes that have taken place on the site of the future casino. The developer of the site has gone to great lengths to backfill the site with soil. Nearly a meter and a half of material has been deposited on top of the former wetland. Looking in areas where fill has not been placed, it is apparent why such great effort to fill the site has taken place. Patches of water, mud and aquatic plants permeate the site, signaling water at the surface of the soil, or just below. Years of degradation have still not managed to beat back the inexorable march …